投资策划网—规模最大、实力最强的研究报告提供商! 关于我们 联系中撰 网站地图
稳评报告
当前位置:主页 > 稳评报告 > >> 2014 Deep Research Report on Global and China Food Additives
2014 Deep Research Report on Global and China Food Additives
2014-04-08 09:53共有人浏览
更多
内 容
 

【Abstract】:

<2014 Deep Research Report on Global and China Food Additives Industry> was professional and depth research report on China Food Additives industry. The report firstly introduced Food Additives basic information included Food Additives definition classification application industry chain structure industry overview; international market analysis, China domestic market analysis, Macroeconomic environment and economic situation analysis and influence, Food Additives industry policy and plan, Food Additives product specification, manufacturing process, product cost structure etc. then statistics Global and China key manufacturers Food Additives capacity production cost price profit production value gross margin etc details information, at the same time, statistics these manufacturers Food Additives products customers application capacity market position BSFontact information etc company related information, then collect all these manufacturers data and listed Global and China Food Additives capacity production capacity market share production market share supply demand shortage import export consumption etc data statistics, and then introduced Global and China Food Additives 2009-2013 capacity production price cost profit production value gross margin etc information. And also listed Food Additives upstream raw materials equipments and down stream clients survey analysis and Food Additives marketing channels industry development trend and proposals. In the end, this report introduced Food Additives new project SWOT analysis Investment feasibility analysis investment return analysis and also give related research conclusions and development trend analysis of Global and China Food Additives industry. In a word, it was a depth research report on China Food Additives industry. And thanks to the support and assistance from Food Additives industry chain related technical experts and marketing engineers during Research Team survey and interviews.

Table of Contents

Chapter One Food Additives Industry Overview 1
1.1 Food Additives Definition 1
1.2 Food Additives Classification and Application 2
1.2.1 Food additives can be divided into several groups, although there is some overlap between them. 2
1.2.2 Food Additives – Ingredients with a Purpose 17
1.3 Food Additives Industry Chain Structure 18
1.4 Food Additives Industry Overview 19

Chapter Two Food Additives International and China Market Analysis 19
2.1 Food Additives Industry International Market Analysis 19
2.1.1 Food Additives International Market Development History 19
2.1.2 Food Additives Product and Technology Developments 20
2.1.3 Food Additives Competitive Landscape Analysis 21
2.1.4 Food Additives International Key Countries Development Status 21
2.1.5 Food Additives International Market Development Trend 23
2.2 Food Additives Industry China Market Analysis 23
2.2.1 Food Additives China Market Development History 23
2.2.2 Food Additives Product and Technology Developments 24
2.2.3 Food Additives Competitive Landscape Analysis 25
2.2.4 Food Additives China Key Regions Development Status 25
2.2.5 Food Additives China Market Development Trend 26
2.3 Food Additives International and China Market Comparison Analysis 27

Chapter Three Food Additives Development Environmental Analysis 28
3.1 China Economic Environment Analysis 28
3.1.1 China GDP Analysis 28
3.1.2 China CPI Analysis 29
3.2 European Economic Environmental Analysis 31
3.3 United States Economic Environmental Analysis 32
3.4 Japan Economic Environmental Analysis 33
3.5 Global Economic Environmental Analysis 34

Chapter Four Food Additives Development Policy and Plan 35
4.1 China Government Policy and Development Plan 35
4.2 Sub-Industry Policy Analysis 37
4.3 Local Policy and Development Analysis 38
4.4 Downstream Industry Policy and Demand Analysis 44
4.5 Hotspots and Influence Analysis 44

Chapter Five Food Additives Manufacturing Process and Cost Structure 52
5.1 Food Additives Product Specifications 52
5.2 Food Additives Manufacturing Process Analysis 54
5.3 Food Additives Cost Structure Analysis 54

Chapter Six 2009-2014 Food Additives Productions Supply Sales Demand Market Status and Forecast 56
6.1 2009-2014 Food Additives Capacity Production Overview 56
6.2 2009-2014 Food Additives Production Market Share Analysis 64
6.3 2009-2014 Food Additives Demand Overview 68
6.4 2009-2014 Food Additives Supply Demand and Shortage 69
6.5 2009-2014 Food Additives Import Export Consumption 70
6.6 2009-2014 Food Additives Cost Price Production Value Gross Margin 70

Chapter Seven Food Additives Key Manufacturers Analysis 74
7.1 BASF 74
7.1.1 Company Profile 75
7.1.2 Product Picture and Specification 76
7.2.3 Capacity Production Price Cost Production Value 78
7.2.4 Contact Information 79
7.2 Danisco 80
7.2.1 Company Profile 80
7.2.2 Product Picture and Specification 80
7.2.3 Capacity Production Price Cost Production Value 83
7.2.4 Contact Information 84
7.3 Sensient 84
7.3.1 Company Profile 84
7.3.2 Product Picture and Specification 85
7.3.3 Capacity Production Price Cost Production Value 87
7.3.4 Contact Information 88
7.4 Cargill 89
7.4.1 Company Profile 89
7.4.2 Product Picture and Specification 91
7.4.3 Capacity Production Price Cost Production Value 92
7.4.4 Contact Information 94
7.5 Ashland 94
7.5.1 Company Profile 94
7.5.2 Product Picture and Specification 96
7.5.3 Capacity Production Price Cost Production Value 97
7.5.4 Contact Information 98
7.6 WILD Flavors 98
7.6.1 Company Profile 99
7.6.2 Product Picture and Specification 100
7.6.3 Capacity Production Price Cost Production Value 101
7.6.4 Contact Information 103
7.7 Ajinomoto 103
7.7.1 Company Profile 103
7.7.2 Product Picture and Specification 104
7.7.3 Capacity Production Price Cost Production Value 104
7.7.4 Contact Information 106
7.8 Tate&Lyle 106
7.8.1 Company Profile 106
7.8.2 Product Picture and Specification 108
7.8.3 Capacity Production Price Cost Production Value 109
7.8.4 Contact Information 111
7.9 Archer Daniels Midland 111
7.9.1 Company Profile 111
7.9.2 Product Picture and Specification 113
7.9.3 Capacity Production Price Cost Production Value 115
7.9.4 Contact Information 116
7.10 Kerry Group 116
7.10.1 Company Profile 117
7.10.2 Product Picture and Specification 118
7.10.3 Capacity Production Price Cost Production Value 121
7.10.4 Contact Information 122
7.11 Kalsec 123
7.11.1 Company Profile 123
7.11.2 Product Picture and Specification 124
7.11.3 Capacity Production Price Cost Production Value 124
7.11.4 Contact Information 125
7.12 Royal DSM 126
7.12.1 Company Profile 126
7.12.2 Product Picture and Specification 128
7.12.3 Capacity Production Price Cost Production Value 132
7.12.4 Contact Information 134
7.13 Chr. Hansen 134
7.13.1 Company Profile 134
7.13.2 Product Picture and Specification 135
7.13.3 Capacity Production Price Cost Production Value 136
7.13.4 Contact Information 138
7.14 NutraSweet 138
7.14.1 Company Profile 138
7.14.2 Product Picture and Specification 140
7.14.3 Capacity Production Price Cost Production Value 141
7.14.4 Contact Information 142
7.15 Firmenich 142
7.15.1 Company Profile 142
7.15.2 Product Picture and Specification 143
7.15.3 Capacity Production Price Cost Production Value 144
7.15.4 Contact Information 146
7.16 Bio Springer 146
7.16.1 Company Profile 147
7.16.2 Product Picture and Specification 148
7.16.3 Capacity Production Price Cost Production Value 149
7.16.4 Contact Information 151
7.17 ABF 151
7.17.1 Company Profile 151
7.17.2 Product Picture and Specification 152
7.17.3 Capacity Production Price Cost Production Value 153
7.17.4 Contact Information 155
7.18 Kraft Food Ingredients 155
7.18.1 Company Profile 155
7.18.2 Product Picture and Specification 159
7.18.3 Capacity Production Price Cost Production Value 159
7.18.4 Contact Information 161
7.19 Ingredion 161
7.19.1 Company Profile 162
7.19.2 Product Picture and Specification 163
7.19.3 Capacity Production Price Cost Production Value 164
7.19.4 Contact Information 165
7.20 Griffith Laboratories (US) 165
7.20.1 Company Profile 166
7.20.2 Product Picture and Specification 167
7.20.3 Capacity Production Price Cost Production Value 174
7.20.4 Contact Information 176
7.21 COFCO 176
7.21.1 Company Profile 176
7.21.2 Product Picture and Specification 178
7.21.3 Capacity Production Price Cost Production Value 179
7.21.4 Contact Information 180
7.22 Bairun 181
7.22.1 Company Profile 181
7.22.2 Product Picture and Specification 181
7.22.3 Capacity Production Price Cost Production Value 182
7.22.4 Contact Information 184
7.23 Star Lake Bioscience 184
7.23.1 Company Profile 184
7.23.2 Product Picture and Specification 187
7.23.3 Capacity Production Price Cost Production Value 188
7.23.4 Contact Information 190
7.24 Angel 190
7.24.1 Company Profile 190
7.24.2 Product Picture and Specification 191
7.24.3 Capacity Production Price Cost Production Value 191
7.24.4 Contact Information 193
7.25 Baolingbao Blology 193
7.25.1 Company Profile 194
7.25.2 Product Picture and Specification 194
7.25.3 Capacity Production Price Cost Production Value 194
7.25.4 Contact Information 196
7.26 CCGB 196
7.26.1 Company Profile 196
7.26.2 Product Picture and Specification 196
7.26.3 Capacity Production Price Cost Production Value 197
7.26.4 Contact Information 198
7.27 Jialong Food 199
7.27.1 Company Profile 199
7.27.2 Product Picture and Specification 201
7.27.3 Capacity Production Price Cost Production Value 201
7.27.4 Contact Information 203
7.28 Aanhui Jinhe Industrial 203
7.28.1 Company Profile 203
7.28.2 Product Picture and Specification 203
7.28.3 Capacity Production Price Cost Production Value 205
7.28.4 Contact Information 207
7.29 QHT 208
7.29.1 Company Profile 208
7.29.2 Product Picture and Specification 210
7.29.3 Capacity Production Price Cost Production Value 211
7.29.4 Contact Information 213
7.30 Layn Natural Ingredients 213
7.30.1 Company Profile 214
7.30.2 Product Picture and Specification 215
7.30.3 Capacity Production Price Cost Production Value 215
7.30.4 Contact Information 217

Chapter Eight Up and Down Stream Industry Analysis and Influence 217
8.1 Upstream Raw Materials Price Analysis and Influence 217
8.2 Upstream Equipments Market Analysis and Influence 218
8.2.1 Saccharify workshop65 219
8.2.2 Fermentation workshop 220
8.2.3 Extraction workshop 220
8.2.4 Refining workshop 221
8.3 Down Stream Demand Analysis and Influence 222
8.4 Down Stream Application Analysis 224

Chapter Nine Food Additives Marketing Channels Analysis 225
9.1 Food Additives Marketing Channels Status 225
9.2 Food Additives Marketing Channels Management 227
9.3 Food Additives Marketing Channels Establishment 228
9.4 Food Additives Marketing Channels Development Trend 230

Chapter Ten 2014-2019 Food Additives Productions Supply Sales Demand Market Status and Forecast 231
10.1 2014-2019 Food Additives Capacity Production Overview 231
10.2 2014-2019 Food Additives Production Market Share Analysis 234
10.3 2014-2019 Food Additives Demand Overview 237
10.4 2014-2019 Food Additives Supply Demand and Shortage 238
10.5 2014-2019 Food Additives Import Export Consumption 238
10.6 2014-2019 Food Additives Cost Price Production Value Gross Margin 239

Chapter Eleven Food Additives Industry Development Proposals 239
11.1 Macroeconomic Development Countermeasures 239
11.1.1 Macroeconomic policy 241
11.1.2 Specific control measures 242
11.2 New Firms Enter Market Strategy 243
11.3 New Project Investment Proposals 245
11.4 Marketing Channel Strategy Proposals 246
11.5 Competitive Environment Strategy Proposals 247

Chapter Twelve Food Additives New Project Investment Feasibility Analysis 248
12.1 Food Additives Project SWOT Analysis 248
12.2 Food Additives New Project Investment Feasibility Analysis 249
12.2.1.1 Project Name 249
12.2.1.2 Project Scale 249
12.2.1.3 Main Construction Content 250
12.2.1.4 Project Planning 250
12.2.1.5 Investment Content 250
12.2.2.1 Project Name 250
12.2.2.2 Investment Budget 251

Chapter Thirteen China Food Additives Industry Research Conclusions 251

Tables and Figures

Figure Food Additives picture 1
Table Types of Food Ingredients 2
Figure citric acid 6
Figure Acidity regulators 6
Figure Anticaking agents 7
Figure Antifoaming agents 7
Figure Antioxidants 8
Figure Bulking agents 9
Figure Food coloring 10
Figure Color retention agents 10
Figure Emulsifiers 11
Figure Flavors 11
Figure Flavor enhancers 12
Figure Flour treatment agents 13
Figure Glazing agents 13
Figure Humectants 14
Figure Tracer gas 14
Figure Preservatives 15
Figure Stabilizers 15
Figure Sweeteners 16
Figure Thickeners 17
Figure Food Additives Industry Chain Structure 18
Figure Food Additives Competitive Landscape Analysis 21
Figure Food Additives Competitive Landscape Analysis 25
Figure 2005-2013 China GDP and Growth Rate 28
Figure 2005-2013 China CPI Change Trend 29
Figure 2005-2013 China PMI Change Trend 29
Figure 2005-2013 China Financial Revenue (Billion yuan) and Growth Rate 30
Figure 2005-2013 China Total Fixed Asset Investment (Billion yuan) and Growth Rate 30
Figure 2005-2013 European GDP Growth Rate 31
Figure 2006-2013 European CPI Change Trend 31
Figure 2005-2013 United States GDP Change Trend 32
Figure 2006-2013 United States CPI Change Trend 32
Figure 2005-2013 Japan GDP Change Trend 33
Figure 2006-2013 Japan CPI Change Trend 33
Table Food Additives Product Specifications 52
Figure Food Additives Manufacturing Process 54
Table Food Additives Cost Structure Analysis 54
Figure Food Additives Cost Structure Analysis 55
Table 2009-2014 Global Major Manufacturers Food Additives Capacity and Total Capacity (K Ton) List 56
Table 2009-2014 Global Major Manufacturers Food Additives Capacity Market Share List 57
Table 2009-2014 Global Major Manufacturers Food Additives Production and Total Production (K Ton) List 58
Table 2009-2014 Global Major Manufacturers Food Additives Production Market Share List 59
Figure 2009-2014 Global Food Additives Capacity Production and Growth Rate 60
Table 2009-2014 Global Food Additives Capacity Utilization Rate List 60
Table 2009-2014 China Major Manufacturers Food Additives Capacity and Total Capacity (K Ton) List 60
Table 2009-2014 China Major Manufacturers Food Additives Capacity Market Share List 61
Table 2009-2014 China Major Manufacturers Food Additives Production and Total Production (K Ton) List 61
Table 2009-2014 China Major Manufacturers Food Additives Production Market Share List 62
Figure 2009-2014 China Food Additives Capacity Production and Growth Rate 62
Table 2009-2014 China Food Additives Capacity Utilization Rate List 63
Figure 2011 Global Major Manufacturers Food Additives Production Market Share 64
Figure 2012 Global Major Manufacturers Food Additives Production Market Share 65
Figure 2013 Global Major Manufacturers Food Additives Production Market Share 66
Figure 2011 China Major Manufacturers Food Additives Production Market Share 67
Figure 2012 China Major Manufacturers Food Additives Production Market Share 67
Figure 2013 China Major Manufacturers Food Additives Production Market Share 68
Figure 2009-2014 Global Food Additives Demand and Growth Rate 68
Figure 2009-2014 China Food Additives Demand and Growth Rate 69
Table 2009-2014 Global Food Additives Supply Demand Shortage (K Ton) List 69
Table 2009-2014 China Food Additives Supply Demand Shortage (K Ton) List 69
Table 2009-2014 China Food Additives Production Import Export (K Ton) Consumption List 70
Table 2009-2014 Global Major Manufacturers Food Additives Price (USD/Ton) List 70
Table 2009-2014 Global Major Manufacturers Food Additives Gross Margin List 71
Table 2009-2014 Global Major Manufacturers Food Additives Production Value (Million USD) List 72
Table 2009-2014 Global Major Manufacturers Food Additives Production Value Share List 73
Table 2009-2014 Global Food Additives Production (K Ton) Price Cost Profit (USD/Ton) Production Value (Million USD) Gross Margin List 74
Table 2009-2014 China Food Additives Production (K Ton) Price Cost Profit (USD/Ton) Production Value (Million USD) Gross Margin List 74
Figure BASF Food Additives Products 76
Figure BASF Food Additives Product Sodium nitrite Application 76
Figure BASF Food Additives Product Potassium metabisulfite Application 77
Figure BASF Food Additives Product Ammonium Bicarbonate Application 77
Table 2009-2014 BASF Food Additives Product Capacity Production (K Ton) Price Cost Gross (USD/Ton) Production Value (Million USD) Analysis 78
Figure 2009-2014 BASF Food Additives Capacity Production (K Ton) and Growth Rate 78
Figure 2009-2014 BASF Food Additives Production Global Market Share 79
Table Danisco Food Additives DuPont™ Danisco® bakery enzymes Product Applications 81
Table Danisco Food Additives Sweetners Product Applications 82
Table 2009-2014 Danisco Food Additives Product Capacity Production (K Ton) Price Cost Gross (USD/Ton) Production Value (Million USD) Analysis 83
Figure 2009-2014 Danisco Food Additives Capacity Production (K Ton) and Growth Rate 83
Figure 2009-2014 Danisco Food Additives Production Global Market Share 84
Table Sensient Food Additives Product Applications 86
Table 2009-2014 Sensient Food Additives Product Capacity Production (K Ton) Price Cost Gross (USD/Ton) Production Value (Million USD) Analysis 87
Figure 2009-2014 Sensient Food Additives Capacity Production (K Ton) and Growth Rate 87
Figure 2009-2014 Sensient Food Additives Production Global Market Share 88
Table Cargill Food Additives Citric acid Product Features and Applications 91
Table Cargill Food Additives Sodium citrate Product Features and Applications 92
Table 2009-2014 Cargill Food Additives Product Capacity Production (K Ton) Price Cost Gross (USD/Ton) Production Value (Million USD) Analysis 92
Figure 2009-2014 Cargill Food Additives Capacity Production (K Ton) and Growth Rate 93
Figure 2009-2014 Cargill Food Additives Production Global Market Share 93
Table Ashland Food Additives Product Features and Applications 96
Table 2009-2014 Ashland Food Additives Product Capacity Production (K Ton) Price Cost Gross (USD/Ton) Production Value (Million USD) Analysis 97
Figure 2009-2014 Ashland Food Additives Capacity Production (K Ton) and Growth Rate 97
Figure 2009-2014 Ashland Food Additives Production Global Market Share 98
Table 2009-2014 WILD Flavors Food Additives Product Capacity Production (K Ton) Price Cost Gross (USD/Ton) Production Value (Million USD) Analysis 101
Figure 2009-2014 WILD Flavors Food Additives Capacity Production (K Ton) and Growth Rate 102
Figure 2009-2014 WILD Flavors Food Additives Production Global Market Share 102
Figure Ajinomoto Food Additives Product Picture 104
Table 2009-2014 Ajinomoto Food Additives Product Capacity Production (K Ton) Price Cost Gross (USD/Ton) Production Value (Million USD) Analysis 104
Figure 2009-2014 Ajinomoto Food Additives Capacity Production (K Ton) and Growth Rate 105
Figure 2009-2014 Ajinomoto Food Additives Production Global Market Share 106
Table 2009-2014 Tate&Lyle Food Additives Product Capacity Production (K Ton) Price Cost Gross (USD/Ton) Production Value (Million USD) Analysis 109
Figure 2009-2014 Tate&Lyle Food Additives Capacity Production (K Ton) and Growth Rate 110
Figure 2009-2014 Tate&Lyle Food Additives Production Global Market Share 110
Table Archer Daniels Midland Food Additives Applications 113
Table Archer Daniels Midland Food Additives Product Specification 114
Table 2009-2014 Archer Daniels Midland Food Additives Product Capacity Production (K Ton) Price Cost Gross (USD/Ton) Production Value (Million USD) Analysis 115
Figure 2009-2014 Archer Daniels Midland Food Additives Capacity Production (K Ton) and Growth Rate 115
Figure 2009-2014 Archer Daniels Midland Food Additives Production Global Market Share 116
Table Kerry Group Food Additives Applications 119
Table 2009-2014 Kerry Group Food Additives Product Capacity Production (K Ton) Price Cost Gross (USD/Ton) Production Value (Million USD) Analysis 121
Figure 2009-2014 Kerry Group Food Additives Capacity Production (K Ton) and Growth Rate 121
Figure 2009-2014 Kerry Group Food Additives Production Global Market Share 122
Table 2009-2014 Kalsec Food Additives Product Capacity Production (K Ton) Price Cost Gross (USD/Ton) Production Value (Million USD) Analysis 124
Figure 2009-2014 Kalsec Food Additives Capacity Production (K Ton) and Growth Rate 125
Figure 2009-2014 Kalsec Food Additives Production Global Market Share 125
Figure Royal DSM Food Additives Product Features and Applications 128
Table 2009-2014 Royal DSM Food Additives Product Capacity Production (K Ton) Price Cost Gross (USD/Ton) Production Value (Million USD) Analysis 132
Figure 2009-2014 Royal DSM Food Additives Capacity Production (K Ton) and Growth Rate 133
Figure 2009-2014 Royal DSM Food Additives Production Global Market Share 133
Figure Chr. Hansen Food Additives Product Features and Applications 135
Table 2009-2014 Chr. Hansen Food Additives Product Capacity Production (K Ton) Price Cost Gross (USD/Ton) Production Value (Million USD) Analysis 136
Figure 2009-2014 Chr. Hansen Food Additives Capacity Production (K Ton) and Growth Rate 137
Figure 2009-2014 Chr. Hansen Food Additives Production Global Market Share 137
Figure NutraSweet Food Additives Product Features and Applications 140
Table 2009-2014 NutraSweet Food Additives Product Capacity Production (K Ton) Price Cost Gross (USD/Ton) Production Value (Million USD) Analysis 141
Figure 2009-2014 NutraSweet Food Additives Capacity Production (K Ton) and Growth Rate 141
Figure 2009-2014 NutraSweet Food Additives Production Global Market Share 142
Figure Firmenich Food Additives Product Features and Applications 143
Table 2009-2014 Firmenich Food Additives Product Capacity Production (K Ton) Price Cost Gross (USD/Ton) Production Value (Million USD) Analysis 144
Figure 2009-2014 Firmenich Food Additives Capacity Production (K Ton) and Growth Rate 145
Figure 2009-2014 Firmenich Food Additives Production Global Market Share 146
Figure Bio Springer Food Additives Product Features and Applications 148
Table 2009-2014 Bio Springer Food Additives Product Capacity Production (K Ton) Price Cost Gross (USD/Ton) Production Value (Million USD) Analysis 149
Figure 2009-2014 Bio Springer Food Additives Capacity Production (K Ton) and Growth Rate 150
Figure 2009-2014 Bio Springer Food Additives Production Global Market Share 150
Figure ABF Food Additives Product Features and Applications 152
Table 2009-2014 ABF Food Additives Product Capacity Production (K Ton) Price Cost Gross (USD/Ton) Production Value (Million USD) Analysis 153
Figure 2009-2014 ABF Food Additives Capacity Production (K Ton) and Growth Rate 154
Figure 2009-2014 ABF Food Additives Production Global Market Share 154
Figure Kraft Food Ingredients Food Additives Product Features and Applications 159
Table 2009-2014 Kraft Food Ingredients Food Additives Product Capacity Production (K Ton) Price Cost Gross (USD/Ton) Production Value (Million USD) Analysis 159
Figure 2009-2014 Kraft Food Ingredients Food Additives Capacity Production (K Ton) and Growth Rate 160
Figure 2009-2014 Kraft Food Ingredients Food Additives Production Global Market Share 161
Figure Ingredion  Food Additives Product Features and Applications 163
Table 2009-2014 Ingredion  Food Additives Product Capacity Production (K Ton) Price Cost Gross (USD/Ton) Production Value (Million USD) Analysis 164
Figure 2009-2014 Ingredion  Food Additives Capacity Production (K Ton) and Growth Rate 164
Figure 2009-2014 Ingredion  Food Additives Production Global Market Share 165
Table Griffith Laboratories (US) Food Additives Product Features and Applications 167
Table 2009-2014 Griffith Laboratories (US) Food Additives Product Capacity Production (K Ton) Price Cost Gross (USD/Ton) Production Value (Million USD) Analysis 174
Figure 2009-2014 Griffith Laboratories (US) Food Additives Capacity Production (K Ton) and Growth Rate 175
Figure 2009-2014 Griffith Laboratories (US) Food Additives Production Global Market Share 176
Figure COFCO Food Additives Product Features and Applications 178
Table 2009-2014 COFCO Food Additives Product Capacity Production (K Ton) Price Cost Gross (USD/Ton) Production Value (Million USD) Analysis 179
Figure 2009-2014 COFCO Food Additives Capacity Production (K Ton) and Growth Rate 179
Figure 2009-2014 COFCO Food Additives Production Global Market Share 180
Figure Bairun Food Additives Product Features and Applications 181
Table 2009-2014 Bairun Food Additives Product Capacity Production (K Ton) Price Cost Gross (USD/Ton) Production Value (Million USD) Analysis 182
Figure 2009-2014 Bairun Food Additives Capacity Production (K Ton) and Growth Rate 183
Figure 2009-2014 Bairun Food Additives Production Global Market Share 184
Figure Guangdong Zhaoqing Food Additives Product Features and Applications 187
Table 2009-2014 Guangdong Zhaoqing Food Additives Product Capacity Production (K Ton) Price Cost Gross (USD/Ton) Production Value (Million USD) Analysis 188
Figure 2009-2014 Guangdong Zhaoqing Food Additives Capacity Production (K Ton) and Growth Rate 189
Figure 2009-2014 Guangdong Zhaoqing Food Additives Production Global Market Share 189
Figure Angel Food Additives Product Features and Applications 191
Table 2009-2014 Angel Food Additives Product Capacity Production (K Ton) Price Cost Gross (USD/Ton) Production Value (Million USD) Analysis 191
Figure 2009-2014 Angel Food Additives Capacity Production (K Ton) and Growth Rate 192
Figure 2009-2014 Angel Food Additives Production Global Market Share 193
Table 2009-2014 Baolingbao Blology Food Additives Product Capacity Production (K Ton) Price Cost Gross (USD/Ton) Production Value (Million USD) Analysis 194
Figure 2009-2014 Baolingbao Blology Food Additives Capacity Production (K Ton) and Growth Rate 195
Figure 2009-2014 Baolingbao Blology Food Additives Production Global Market Share 195
Table 2009-2014 CCGB Food Additives Product Capacity Production (K Ton) Price Cost Gross (USD/Ton) Production Value (Million USD) Analysis 197
Figure 2009-2014 CCGB Food Additives Capacity Production (K Ton) and Growth Rate 198
Figure 2009-2014 CCGB Food Additives Production Global Market Share 198
Figure Jialong Food Food Additives Product Features and Applications 201
Table 2009-2014 Jialong Food Food Additives Product Capacity Production (K Ton) Price Cost Gross (USD/Ton) Production Value (Million USD) Analysis 201
Figure 2009-2014 Jialong Food Food Additives Capacity Production (K Ton) and Growth Rate 202
Figure 2009-2014 Jialong Food Food Additives Production Global Market Share 202
Figure Aanhui Jinhe Industrial Food Additives Product Features and Applications  Acesulfame-K 203
Table 2009-2014 Aanhui Jinhe Industrial Food Additives Product Capacity Production (K Ton) Price Cost Gross (USD/Ton) Production Value (Million USD) Analysis 205
Figure 2009-2014 Aanhui Jinhe Industrial Food Additives Capacity Production (K Ton) and Growth Rate 206
Figure 2009-2014 Aanhui Jinhe Industrial Food Additives Production Global Market Share 207
Figure QHT Food Additives Product Features and Applications 210
Table 2009-2014 QHT Food Additives Product Capacity Production (K Ton) Price Cost Gross (USD/Ton) Production Value (Million USD) Analysis 211
Figure 2009-2014 QHT Food Additives Capacity Production (K Ton) and Growth Rate 212
Figure 2009-2014 QHT Food Additives Production Global Market Share 213
Figure Layn Natural Ingredients Food Additives Product Features and Applications 215
Table 2009-2014 Layn Natural Ingredients Food Additives Product Capacity Production (K Ton) Price Cost Gross (USD/Ton) Production Value (Million USD) Analysis 215
Figure 2009-2014 Layn Natural Ingredients Food Additives Capacity Production (K Ton) and Growth Rate 216
Figure 2009-2014 Layn Natural Ingredients Food Additives Production Global Market Share 216
Figure 2009-2014 China Corn Price Trend 217
Figure 2009-2014 China Soybean Price Trend 218
Figure 2013-2014 Global Crude Oil Average Price Trend 218
Table Saccharify workshop equipment list 219
Table Fermentation workshop equipment 220
Table Extraction workshop equipment 220
Figure 2009-2014 Global demand and Global demand growth rate 222
Figure 2009-2014 China demand and China demand growth rate 222
Figure 2014-2019 Global demand and Global demand growth rate 223
Figure 2014-2019 China demand and China demand growth rate 223
Figure Food Additives domestic sales channels 225
Figure Food Additives distribution channels abroad 226
Figure 2013 China FOOD ADDITIVES Marketing Channels Distribution 230
Figure 2017 China FOOD ADDITIVES Marketing Channels Distribution 230
Figure 2014-2019 Global Food Additives Capacity Production (K Ton) and Growth Rate 231
Table 2014-2019 Global Food Additives Capacity Utilization Rate List 232
Figure 2014-2019 China Food Additives Capacity Production (K Ton) and Growth Rate 232
Table 2014-2019 China Food Additives Capacity Utilization Rate List 233
Figure 2014 Global Major Manufacturers Food Additives Production Market Share 234
Figure 2019 Global Major Manufacturers Food Additives Production Market Share 235
Figure 2014 China Major Manufacturers Food Additives Production Market Share 236
Figure 2019 China Major Manufacturers Food Additives Production Market Share 236
Figure 2014-2019 Global Food Additives Demand (K Ton) and Growth Rate 237
Figure 2014-2019 China Food Additives Demand (K Ton) and Growth Rate 237
Table 2014-2019 Global Food Additives Supply Demand Shortage (K Ton) List 238
Table 2014-2019 China Food Additives Supply Demand Shortage (K Ton) List 238
Table 2014-2019 China Food Additives Production Import Export (K Ton) Consumption List 238
Table 2014-2019 Global Food Additives Production (K Ton) Price Cost Profit (USD / Ton) Production Value (Million USD) Gross Margin List 239
Table 2014-2019 China Food Additives Production (K Ton) Price Cost Profit (USD / Ton) Production Value (Million USD) Gross Margin List 239
Table Macroeconomic Development Countermeasures Analysis 240
Table New Firms Enter Market Strategy 243
Table Food Additives Marketing Channel Strategy Proposals 246
Table Competitive Environment Strategy Proposals 246
Figure Food Additives marketing strategy recommendations 247
Table 2013 China MSG New Projects SWOT Analysis List 248
Table Pectinase Project SWOT Analysis 249
Table Annual output of 1000 ton Food Additives production line return on investment and feasibility analysis 251


【编辑:中国投资政策网】 TOP
专项定制报告专项定制报告分类
专项报告类别:
商业计划书 | 可行性研究报告 | 资金申请报告
可行性报告 | 项目申请报告 | 英文报告
联系方式
·联系人:
余先生、方小姐
·电话号码:
15989039303、(0086)020-28908140
·地址:
广州市番禺区桥南街福德路241号奥园广场塔三1305室

订购流程订购流程
① 签订可行性报告订购合同;
② 通过银行转帐、邮局汇款等形式款项;
③ 中国投资策划网见到汇款底单或者转帐底单后,24小时内发送可行性研究报告电子版,72小时内寄送正式版以及发票。