当前位置:主页 > 稳评报告 > >> Global and China Epoxy Resin Industry Chain Report, 2012-201
Global and China Epoxy Resin Industry Chain Report, 2012-201
2012-05-02 09:44共有人浏览
更多
内 容
 

 

【Abstract】:

Epoxy resin is a polymeric compound containing two or more epoxy groups and mainly finds application in coatings, electrical systems and electronics, and composite materials which together consume around 80% of the global epoxy resin.

In 2011, the global epoxy resin output approximated 2.24 million tons (80%-95% of which were Bisphenol A Epoxy Resin) and was mainly distributed in Asia, Western Europe and the United States where their output totally made up over 90% of the global total. Among these origins, China is the world’s largest producer and delivers about 37.1% of the global total output. As the European and American markets grow saturated, the increase of epoxy resin production is principally contributed by Asian countries especially China. In 2005-2011, the CAGR of epoxy resin output in China hit 10.8%, while that in Euro-American regions was only 3% or so.

Chinese epoxy resin manufacturers started late and few of them possess absolute scale advantages, featuring lower industry concentration degree than Euro-American nations. In 2011, the top 10 epoxy resin producers in Mainland China accounted for 60% of the national total capacity, while the capacity of the world’s top 6 epoxy resin manufacturers made up 61.8% of the global total. In this year, the top 3 epoxy resin manufacturers by capacity in Mainland China included Nan Ya Epoxy Resin (Kunshan) Co., Ltd., Sanmu Group and Kingboard Chemical Holdings Ltd.

Nan Ya Epoxy Resin (Kunshan) Co., Ltd. is the epoxy resin production base of Taiwan-based Nan Ya Plastics Corporation. As the Phase-II boasting annual capacity of 186.3 kt epoxy resins was put into production, the company’s epoxy resin capacity amounted to 316 kt/a in 2011, occupying 17.6% of the total capacity in Chinese Mainland, and Nan Ya Plastic Corporation thus becomes the world’s largest producer of epoxy resin and enjoys capacity of 480 kt/a. Sanmu Group ranked No. 5 in the world in 2011 by virtue of 200 kt/a epoxy resin and now has a 70 kt/a epoxy resin project under construction which will be put into operation in 2012.

Most epoxy resins are produced from a reaction between epichlorohydrin and bisphenol-A which boasted output of 450,000 tons and 400,000 tons respectively in Mainland China in 2011, with self-sufficiency rates of 99.1% and 41.0% separately.

The epichlorohydrin market in Chinese Mainland is dominated by domestic manufacturers. In 2011, the top 3 companies by capacity were Shandong Haili Chemical Industry Co., Ltd., Shandong Wudi Xinyue Chemical Co., Ltd. and Tianjin Botian Chemical Co., Ltd., of which Shandong Haili Chemical Industry maintained No. 1 in Asia and No. 2 in the world for its epichlorohydrin capacity.

The market demand for bisphenol A is largely dependent on imports. In 2011, the top 3 bisphenol A manufacturers by capacity in Mainland China included Bayer (Shanghai) Polymer Co., Ltd., Sinopec Mitsubishi Chemical Polycarbonate (Beijing) Co., Ltd. and Shanghai Sinopec Mitsui Chemicals Co., Ltd.

It is in the report that covers the followings:

 The market size, competition pattern, consumption structure and regional distribution of the global epoxy resin industry;

 The supply & demand, competitive landscape, import & export, price trend and projects to be built/under construction of Chinese epoxy resin industry;

 The supply & demand, competition pattern, import & export, price trend and projects to be built/under construction of the upstream epichlorohydrin market;

 The supply & demand, competition structure, import & export, price trend and projects to be built/under construction of the upstream bisphenol A market;

 The demand structure and development forecast of epoxy resin in the downstream coatings, electrical systems and electronics, and composite materials;

 The operation, production and marketing, suppliers, customers and capacity of 15 epoxy resin manufacturers at home and abroad.


【Table of Contents】 

1 Overview of Epoxy Resin Industry
1.1 Profile and Properties
1.2 Classification and Application
1.3 Industry Chain

2 Global Epoxy Resin Industry
2.1 Status Quo
2.2 Market Size
2.3 Competition Pattern
2.4 Consumption Structure
2.5 Development Tendency

3 Chinese Epoxy Resin Industry
3.1 History
3.2 Policy Environment
3.3 Status Quo
3.4 Supply
3.5 Demand
3.6 Competition Pattern
3.7 Import & Export
3.8 Price Trend
3.9 Prospect

4 Upstream of Chinese Epoxy Resin Industry
4.1 Epichlorohydrin (ECH)
4.1.1 Overview
4.1.2 Status Quo
4.1.3 Supply
4.1.4 Demand
4.1.5 Import & Export
4.1.6 Price Trend
4.2 Bisphenol A (BPA)
4.2.1 Overview
4.2.2 Supply
4.2.3 Demand
4.2.4 Import & Export
4.2.5 Price Trend

5 Downstream of Chinese Epoxy Resin Industry
5.1 Demand from Coating Industry
5.2 Demand from Electronic & Electric Industry
5.3 Demand from Composite Material Industry
5.4 Forecast

6 Key Overseas Manufacturers
6.1 Momentive
6.1.1 Profile
6.1.2 Overview of Epoxy Resin Business
6.1.3 Operation of Epoxy Resin Business
6.1.4 Developments and Business in China
6.2 DOW
6.2.1 Profile
6.2.2 Operation of Segment Performance Materials
6.2.3 Operation of Epoxy Resin Business
6.2.4 Business in China
6.2.5 Capacity Dynamic
6.3 Huntsman
6.3.1 Profile
6.3.2 Operation of Epoxy Resin Business
6.3.3 Business in China
6.3.4 Capacity Dynamics
6.4 KUKDO
6.4.1 Profile
6.4.2 Operation
6.4.3 Business in China
6.4.4 Capacity Dynamics

7 Main Manufacturers in Chinese Mainland
7.1 Epoxy Base Electronic Material Corporation Limited
7.1.1 Profile
7.1.2 Operation
7.1.3 Production and Sales
7.1.4 Clients and Suppliers
7.1.5 Prices of Raw Materials
7.1.6 Capacity Dynamics
7.2 Blue Star New Chemical Materials Co., Ltd.
7.2.1 Profile
7.2.2 Operation
7.2.3 Epoxy Resin Business
7.2.4 Clients
7.2.5 Capacity Dynamics
7.3 Nan Ya Epoxy Resin (Kunshan) Co., Ltd.
7.3.1 Profile
7.3.2 Operation
7.3.3 Overview of Nan Ya Plastics Corporation
7.3.4 Epoxy Resin Business of Nan Ya Plastics Corporation
7.3.5 Suppliers and Clients of Nan Ya Plastics Corporation
7.4 Jiangsu Sanmu Group
7.4.1 Profile
7.4.2 Operation
7.4.3 Capacity Dynamics
7.5 Kingboard Chemical Holdings Ltd.
7.5.1 Profile
7.5.2 Operation of Kingboard Laminates Holdings Limited
7.5.3 Epoxy Resin Business
7.6 Others
7.6.1 Dalian Qihua Chemical Co., Ltd.
7.6.2 Changchun Chemical (Jiangsu) Co., Ltd.
7.6.3 Langfang NORSUN Chemical Co., Ltd.
7.6.4 Anhui Hengyuan Chemical Co., Ltd.
7.6.5 Jiangsu Kumho Yangnong Chemical Co., Ltd.
7.6.6 Shanghai Yoo-point Chemical Industry Co., Ltd.


【Figures & Tables】

Classification of Epoxy Resin
Epoxy Resin Industry Chain
Global Epoxy Resin Output and YoY Growth Rate, 2005-2011
Global Epoxy Resin Output by Region, 2011 
Capacity of Major Epoxy Resin Manufacturers Worldwide, 2011
Consumption Structure of Epoxy Resin in the U.S. and West Europe, 2010
Consumption Structure of Epoxy Resin in Asia, 2010
Main Epoxy Resin Manufacturers in Mainland China, 2011
Epoxy Resin Projects to Be Built/Under Construction in China, 2012
Output, Apparent Consumption and Self-sufficiency Rate of Epoxy Resin in China, 2005-2011
Competition Pattern of Epoxy Resin Enterprises in Mainland China, 2011
Import & Export Volume of Epoxy Resin in China, 2007-2011
Import & Export Value of Epoxy Resin in China, 2007-2011
Import & Export Average Price of Epoxy Resin in China, 2007-2011
Import Volume of Epoxy Resin in China by Origin, 2011
Export Volume of Chinese Epoxy Resin by Country or Region, 2011
Import Volume of Epoxy Resin by Province & City in China, 2011
Export Volume of Epoxy Resin by Province & City in China, 2011
Average Market Price of Epoxy Resin in China, 2010-2012
Epichlorohydrin Manufacturers and Their Capacity in Mainland China, 2011
Epichlorohydrin Capacity by Region in China, 2011
Capacity Structure of Epichlorohydrin by Process in China, 2011
Epichlorohydrin Projects to Be Built/Under Construction in China, 2012
Output and Apparent Consumption of Epichlorohydrin in China, 2006-2011
Import & Export Volume of Epichlorohydrin in China, 2007-2011
Import & Export Value of Epichlorohydrin in China, 2007-2011
Import & Export Average Price of Epichlorohydrin in China, 2007-2011
Import Volume of Epichlorohydrin by Origin in China, 2011
Export Volume of Chinese Epichlorohydrin by Destination, 2011
Average Price of Epichlorohydrin in China, 2006-2011
Bisphenol A Manufacturers and Their Capacity in Mainland China, 2011
Bisphenol A Projects to Be Built/Under Construction in China, 2012
Output and Apparent Consumption of Bisphenol A in China, 2006-2011
Import & Export Volume of Bisphenol A in China, 2007-2011
Import & Export Value of Bisphenol A in China, 2007-2011
Import of Bisphenol A by Origin in China, 2011
Export of Bisphenol A by Destination in China, 2011
Average Price of Bisphenol A in China, 2006-2011
Consumption Structure of Downstream Epoxy Resin Industry in China, 2011
Output and YoY Growth Rate of Coatings in China, 2006-2011
Operating Revenue and YoY Growth Rate of Electronic Equipment Manufacturing Industry in China, 2006-2011
Installed Capacity and YoY Growth Rate of Wind Power in China, 2006-2011
Consumption Structure of Downstream Epoxy Resin Industry in China, 2011 and 2015E
Application of Epoxy Specialty Resins of Momentive
Application of Basic Epoxy Resins of Momentive
Net Sales Breakdown of Momentive by Product, 2008-2010
Net Sales and EBITDA of Epoxy and Phenolic Resin Segment of Momentive, 2008-2010
Net Sales Breakdown of DOW by Segment, 2011
Net Sales and EBITDA of Performance Materials Segment of DOW, 2009-2011
Net Sales Breakdown of Performance Materials Segment of DOW by Product, 2011
Manufacturing Bases of Epoxy Resin and Related Products of DOW
Operating Revenue and Gross Profit of DOW Chemical (Zhangjiagang), 2007-2009
Business Divisions and Major Products of Huntsman
Operating Revenue of Huntsman by Division, 2009-2010
Operating Revenue and EBITDA of Advanced Materials Division of Huntsman, 2008-2010
Operating Revenue and Gross Profit of Huntsman Advanced Materials (Guangdong), 2007-2009
Sales and Net Income of Kukdo Chemical, 2006-2010
Operating Revenue and Gross Profit of Kukdo Chemical (Kunshan), 2007-2009
Operating Revenue and Total Profit of Epoxy Base Electronic Material Corporation, 2008-H1 2011
Operating Revenue of Epoxy Base Electronic Material Corporation by Product, 2009-H1 2011
Operating Revenue of Epoxy Base Electronic Material Corporation by Region, 2009-H1 2011
Gross Margin of Major Products of Epoxy Base Electronic Material Corporation, 2009-H1 2011
Epoxy Resin Capacity of Epoxy Base Electronic Material Corporation, 2002-2011
Epoxy Resin Sales Volume and Market Share of Epoxy Base Electronic Material Corporation, 2008-2010
Epoxy Resin Output of Epoxy Base Electronic Material Corporation by Product, 2009-H1 2011
Average Price of Main Epoxy Resin Products of Epoxy Base Electronic Material Corporation, 2010-H1 2011
Contribution of Top 5 Customers to Operating Revenue of Epoxy Base Electronic Material Corporation, 2008-H1 2011
Contribution of Top 5 Customers to Operating Revenue of Epoxy Base Electronic Material Corporation, 2010
Top 5 Suppliers of Epoxy Base Electronic Material Corporation by Procurement, 2008-H1 2011
Top 5 Suppliers of Epoxy Base Electronic Material Corporation by Procurement, 2010
Procurement Price of Raw Materials of Epoxy Base Electronic Material Corporation, 2008-H1 2011
Capacity of Epoxy Resin and Bisphenol A of Blue Star New Chemical Materials, 2011
Operating Revenue and Total Profit of Blue Star New Chemical Materials, 2007-2011
Operating Revenue of Blue Star New Chemical Materials by Product, 2009-2011
Operating Revenue of Blue Star New Chemical Materials by Region, 2009-2011
Gross Margin of Major Products of Blue Star New Chemical Materials, 2009-2011
Operating Revenue and Gross Profit of Epoxy Resin/Bisphenol A/Engineering Plastics Business of Blue Star New Chemical Materials, 2008-2011
Contribution of Top 5 Clients to Operating Revenue of Blue Star New Chemical Materials, 2009-2011
Contribution of Top 5 Clients to Operating Revenue of Blue Star New Chemical Materials, 2010
Operating Revenue and Operating Income of Nan Ya Epoxy Resin (Kunshan), 2008-2010
Main Products of Nan Ya Plastics Corporation
Epoxy Resin Products of Nan Ya Plastics Corporation
Contribution of Epoxy Resin Business to Operating Revenue of Nan Ya Plastics Corporation, 2008-2010
Intra-firm and Outside Sales Volume of Epoxy Resin of Nan Ya Plastics Corporation, 2008-2010
Top 3 Suppliers of Nan Ya Plastics Corporation by Procurement, 2008-2010
Top 3 Suppliers of Nan Ya Plastics Corporation by Procurement, 2010
Major Products of Jiangsu Sanmu Group
Operating Revenue and Gross Profit of Jiangsu Sanmu Group, 2007-2009
Operating Revenue and Net Income of Kingboard Laminates Holdings, 2006-2010
Operating Revenue of Kingboard Laminates Holdings by Product, 2008-2010
Operating Revenue of Kingboard Laminates Holdings by Region, 2008-2010
Operating Revenue of Upstream Materials Business of Kingboard Laminates Holdings, 2008-2010
Operating Revenue and Gross Profit of Dalian Qihua Chemical, 2007-2009
Operating Revenue and Gross Profit of Changchun Chemical (Jiangsu), 2007-2009
Operating Revenue and Gross Profit of Langfang NORSUN Chemical, 2007-2009
Operating Revenue and Gross Profit of Anhui Hengyuan Chemical, 2007-2009 


【编辑:中国投资政策网】 TOP
专项定制报告专项定制报告分类
专项报告类别:
商业计划书 | 可行性研究报告 | 资金申请报告
可行性报告 | 项目申请报告 | 英文报告
联系方式
·联系人:
余先生、方小姐
·电话号码:
15989039303、(0086)020-66699282
·地址:
广州市番禺区桥南街福德路241号奥园广场塔三1305室

订购流程订购流程
① 签订可行性报告订购合同;
② 通过银行转帐、邮局汇款等形式款项;
③ 中国投资策划网见到汇款底单或者转帐底单后,24小时内发送可行性研究报告电子版,72小时内寄送正式版以及发票。