投资策划网—规模最大、实力最强的研究报告提供商! 关于我们 联系中撰 网站地图
稳评报告
当前位置:主页 > 稳评报告 > >> 2018 Deep Research Report on Global and China Machine Tool I
2018 Deep Research Report on Global and China Machine Tool I
2018-02-24 09:55共有人浏览
更多
内 容
 

【导读】

 :
2018 Deep Research Report on Global and China Machine Tool Industry
 

【报告目录】

 :
【Report Name】:2018 Deep Research Report on Global and China Machine Tool Industry
【Published】:May/2018
【Report Code】:QY
Pages: 570
Tables and figures: 1052
【Form】: PDF or Hard copy  
【Delivery】: E-mail or EMS
【Report Price】:Hard copy: 3200 USD 
Electronic copy (PDF Single User):3200USD 
Global License: 6600USD
【Abstract】:
<2018 Deep Research Report on Global and China Machine Tool Industry> was professional and depth research report on Machine Tool industry. Firstly, the report has introduced Machine Tool basic information such as Machine Tool definition classification and manufacturing process product specifications. Then introduced global and China 32 manufacturers Machine Tool capacity production cost selling price Gross production value gross margin etc details information of each company, also introduced these manufacturers product specifications and company background. And then statistics global Machine Tool capacity market share and production market share, China, America and Europe, Japan, Korea, Taiwan etc regional Machine Tool production and market share. Global and China Machine Tool demand and supply demand relationship. Global and China Machine Tool 2009-2018 Capacity, production, prices, costs,gross, output, gross margins,production market share by different type miachine((Lathe,Drilling Machine,Milling Machine,Boring Machine,Grinding Machine,Machining Center etc metal cutting Machine Tool;press, Bending, Shearing, Casting,Punching etc Metal Forming Machine Tool) and so on,at the same tine, the report also analyzed the relation of Global and China Machine Tool demand and supply; analysis and predict the development trend of the global and china Machine Tool industry;finally, the report also introduced 2500Set/Year CNC Lathe Project feasibility analysis and related research conclusions ,and summarize the past , nowadays and future of the global and china Machine Tool comprehensively and deeply. In a word, it was a depth research report on Global and China Machine Tool industry. And thanks to the support and assistance from Machine Tool industry chain related experts and enterprises.

Table of Contents
Chapter One Machine Tool Industry Overview 1
1.1 Machine Tool Definition 1
1.2 Machine Tool Classification and Application 5
1.3 Machine Tool Industry Chain Structure 10
1.4 Machine Tool Industry Overview 12
1.5 China Machine Tool Industry Policy 14
Chapter Two Machine Tool Technical Specifications and Manufacturing Process 16
2.1 Product Technical Specification 16
2.2 Product Manufacturing Process 28
2.3 Manufacturing Cost Analysis 29
Chapter Three Machine Tool Production Supply Sales Demand Market Status and Forecast 32
3.1 Global Capacity Production Overview 32
3.2 China Capacity Production Overview 39
3.3 2009-2018 Global and China Metal Cutting Metal Forming Machine Tool Production and Market Share 44
3.4 2009-2018 Global and China Lathe,Drilling,Milling,Boring,Grinder,Machining Center and Other Metal Cutting Machine Tool Production and Market Share 48
3.5 2009-2018 Global and China Press,Bending,Shearing,Casting,Punching and Other Metal Forming Machine Tool Production and Market Share 53
3.6 2012 Global and China Machine Tool Manufacturers Capacity Utilization Rate 58
3.7 2009-2018 Machine Tool China Capacity Production and its Global Proportion 62
3.8 Global and China Machine Tool Demand Overview 63
3.9 Global and China Machine Tool Supply Demand and Gap 67
3.10 Global and China Machine Tool Cost Price Production Value Gross Margin 71
3.11 China Machine Tool Import Export Consumption 74
Chapter Four Lathe Production Supply Sales Demand Market Status and Forecast 75
4.1 Global Capacity Production Overview 75
4.2 China Capacity Production Overview 81
4.3 2012 Global and China Lathe Manufacturers Capacity Utilization Rate 85
4.4 2009-2018 Lathe China Capacity Production and Its Global Proportion 86
4.5 Global and China Machine Tool Demand Overview 86
4.6 Global and China Lathe Supply Demand and Gap 88
4.7 Global and China Lathe Cost Price Production Value Gross Margin 89
4.8 China Lathe Import Export Consumption 90
Chapter Five Drilling Machine Production Supply Sales Demand Market Status and Forecast 91
5.1 Global Capacity Production Overview 91
5.2 China Capacity Production Overview 95
5.3 2012 Global and China Drilling Machine Manufacturers Capacity Utilization Rate 98
5.4 2009-2018 Drilling Machine China Capacity Production and Its Global Proportion 99
5.5 Global and China Machine Tool Demand Overview 99
5.6 Global and China Drilling Machine Supply Demand and Gap 101
5.7 Global and China Drilling Machine Cost Price Production Value Gross Margin 102
5.8 China Drilling Machine Import Export Consumption 103
Chapter Six Milling Machine Production Supply Sales Demand Market Status and Forecast 104
6.1 Global Capacity Production Overview 104
6.2 China Capacity Production Overview 109
6.3 2012 Global and China Milling Machine Manufacturers Capacity Utilization Rate 113
6.4 2009-2018 Milling Machine China Capacity Production and Its Global Proportion 114
6.5 Global and China Machine Tool Demand Overview 114
6.6 Global and China Milling Machine Supply Demand and Gap 116
6.7 Global and China Milling Machine Cost Price Production Value Gross Margin 117
6.8 China Milling Machine Import Export Consumption 118
Chapter Seven Boring Machine Production Supply Sales Demand Market Status and Forecast 119
7.1 Global Capacity Production Overview 119
7.2 China Capacity Production Overview 123
7.3 2012 Global and China Boring Machine Manufacturers Capacity Utilization Rate 127
7.4 2009-2018 Boring Machine China Capacity Production and Its Global Proportion 127
7.5 Global and China Machine Tool Demand Overview 128
7.6 Global and China Boring Machine Supply Demand and Gap 129
7.7 Global and China Boring Machine Cost Price Production Value Gross Margin 131
7.8 China Boring Machine Import Export Consumption 132
Chapter Eight Grinding Machine Production Supply Sales Demand Market Status and Forecast 133
8.1 Global Capacity Production Overview 133
8.2 China Capacity Production Overview 137
8.3 2012 Global and China Grinding Machine Manufacturers Capacity Utilization Rate 140
8.4 2009-2018 Grinding Machine China Capacity Production and Its Global Proportion 141
8.5 Global and China Machine Tool Demand Overview 141
8.6 Global and China Grinding Machine Supply Demand and Gap 143
8.7 Global and China Grinding Machine Cost Price Production Value Gross Margin 144
8.8 China Grinding Machine Import Export Consumption 145
Chapter Nine Machining Center and Other Machine Tool Production Supply Sales Demand Market Status and Forecast 146
9.1 Global Capacity Production Overview 146
9.2 China Capacity Production Overview 152
9.3 2012 Global and China Machining Center and Other Machine Tool Manufacturers Capacity Utilization Rate 156
9.4 2009-2018 Machining Center and Other Machine Tool China Capacity Production and Its Global Proportion 158
9.5 Global and China Machine Tool Demand Overview 158
9.6 Global and China Machining Center and Other Machine Tool Supply Demand and Gap 160
9.7 Global and China Machining Center and Other Machine Tool Cost Price Production Value Gross Margin 161
9.8 China Machining Center and Other Machine Tool Import Export Consumption 162
Chapter Ten Press Machine Tool Production Supply Sales Demand Market Status and Forecast 163
10.1 Global Capacity Production Overview 163
10.2 China Capacity Production Overview 167
10.3 2012 Global and China Press Machine Tool Manufacturers Capacity Utilization Rate 171
10.4 2009-2018 Press Machine Tool China Capacity Production and Its Global Proportion 172
10.5 Global and China Machine Tool Demand Overview 172
10.6 Global and China Press Machine Tool Supply Demand and Gap 174
10.7 Global and China Press Machine Tool Cost Price Production Value Gross Margin 175
10.8 China Press Machine Tool Import Export Consumption 176
Chapter Eleven Bending Machine Production Supply Sales Demand Market Status and Forecast 177
11.1 Global Capacity Production Overview 177
11.2 China Capacity Production Overview 181
11.3 2012 Global and China Bending Machine Manufacturers Capacity Utilization Rate 184
11.4 2009-2018 Bending Machine China Capacity Production and Its Global Proportion 185
11.5 Global and China Machine Tool Demand Overview 185
11.6 Global and China Bending Machine Supply Demand and Gap 187
11.7 Global and China Bending Machine Cost Price Production Value Gross Margin 188
11.8 China Bending Machine Import Export Consumption 189
Chapter Twelve Shearing Machine Production Supply Sales Demand Market Status and Forecast 190
12.1 Global Capacity Production Overview 190
12.2 China Capacity Production Overview 194
12.3 2012 Global and China Shearing Machine Manufacturers Capacity Utilization Rate 198
12.4 2009-2018 Shearing Machine China Capacity Production and Its Global Proportion 198
12.5 Global and China Machine Tool Demand Overview 199
12.6 Global and China Shearing Machine Supply Demand and Gap 200
12.7 Global and China Shearing Machine Cost Price Production Value Gross Margin 202
12.8 China Shearing Machine Import Export Consumption 203
Chapter Thirteen Casting Machine Production Supply Sales Demand Market Status and Forecast 204
13.1 Global Capacity Production Overview 204
13.2 China Capacity Production Overview 208
13.3 2012 Global and China Casting Machine Manufacturers Capacity Utilization Rate 211
13.4 2009-2018 Casting Machine China Capacity Production and Its Global Proportion 211
13.5 Global and China Machine Tool Demand Overview 212
13.6 Global and China Casting Machine Supply Demand and Gap 213
13.7 Global and China Casting Machine Cost Price Production Value Gross Margin 215
13.8 China Casting Machine Import Export Consumption 216
Chapter Fourteen Punching and Other Machine Tool Production Supply Sales Demand Market Status and Forecast 217
14.1 Global Capacity Production Overview 217
14.2 China Capacity Production Overview 222
14.3 2012 Global and China Punching and Other Machine Tool Manufacturers Capacity Utilization Rate 226
14.4 2009-2018 Punching and Other Machine Tool China Capacity Production and Its Global Proportion 227
14.5 Global and China Machine Tool Demand Overview 228
14.6 Global and China Punching and Other Machine Tool Supply Demand and Gap 229
14.7 Global and China Punching and Other Machine Tool Cost Price Production Value Gross Margin 231
14.8 China Punching and Other Machine Tool Import Export Consumption 232
Chapter Fifteen Machine Tool Key Manufacturers Research 233
15.1 Shenyang Machine Tools Co.,Ltd (China Liaoning) 233
15.2 Japan MAZAK (Japan) 244
15.3 Germany Trumpf (Germany) 252
15.4 Dalian Maching Tool Group Corp. (China Liaoning) 265
15.5 Japan Komatsu (Japan) 278
15.6 Japan JTEKT (Japan) 292
15.7 Japan AMADA (Japan) 302
15.8 Germany Gildemeister (Germany) 316
15.9 Japan MORI SEIKI (Japan) 325
15.10 Japan Okuma (Japan) 331
15.11 Korea HYUNDAI WIA Machine Tool (Korea) 340
15.12 Japan Makino (Japan) 351
15.13 Germany Schuler (Germany) 359
15.14 United States MAG (United States) 372
15.15 Switzerland GF (Switzerland ) 385
15.16 Germany Grob (Germany) 398
15.17 Korea Doosan (Korea) 404
15.18 Germany INDEX (Germany) 413
15.19 Germany Schleifring (Germany) 422
15.20 United States Gleason (United States) 430
15.21 Japan Brother (Japan) 438
15.22 Germany Chiron (Germany) 446
15.23 Qiqihar No.2 Machine Tool (Group) Co., Ltd. (China Heilongjiang) 455
15.24 Jier Machine Tool Group Co.,Ltd (China Shandong) 471
15.25 Jinan First Machine Tool Group Co.,Ltd (China Shandong) 489
15.26 Baoji NACGUBE Tool.,LTD (China Shanxi) 496
15.27 Jiangsu Yangli Group Co., Ltd. (China Jiangsu) 508
15.28 WORLD Group (China Jiangsu) 524
15.29 Tianjin Tianduan Press Co.,Ltd. (China Tianjin) 537
15.30 Jiangsu Jinfangyuan CNC Machine Co.,Ltd. (China Jiangsu) 543
15.31 Shanghai Machine Tool Works Ltd (China Shanghai) 552
15.32 Hangzhou Hangji Machine Tool Co., Ltd. (China Zhejiang) 558
Chapter Sixteen 2500Set/Year CNC Lathe Project Feasibility Analysis 565
16.1 Machine Tool Project SWOT Analysis 565
16.2 Proejct Feasibility Analysis 565
16.2.1 Project Name 565
16.2.2 Proejct Scale 566
16.2.3 Project Constructions 566
16.2.4 Proejct Schedule 566
16.2.5 Proejct Investments 566
16.2.6 Project Investment Return and Feasibility Analysis 567
Chapter Seventeen Global and China Machine Tool Research Conclusions 569
 

【编辑:中国投资政策网】 TOP
专项定制报告专项定制报告分类
专项报告类别:
商业计划书 | 可行性研究报告 | 资金申请报告
可行性报告 | 项目申请报告 | 英文报告
联系方式
·联系人:
余先生、方小姐
·电话号码:
15989039303、(0086)020-66699282
·地址:
广州市番禺区桥南街福德路241号奥园广场塔三1305室

订购流程订购流程
① 签订可行性报告订购合同;
② 通过银行转帐、邮局汇款等形式款项;
③ 中国投资策划网见到汇款底单或者转帐底单后,24小时内发送可行性研究报告电子版,72小时内寄送正式版以及发票。